| Amoco Marlin |
240,000 ft. of 10" and 12" OD Fusion Bond Epoxy,
Buckle Arrestor Insertion, Anode and Anode Taper Installation |
| ANR / Coastal Typhoon |
94,200' of 12" and 182,920' of 20"OD Fusion Bonded Epoxy,
Concrete Weight Coating, Miscellaneous Fabrication Transitions, Flex Head
Assemblies, Beveling and ID Boring, TSA Coating, Anode Installation |
| BP Pompano |
50,000 ft. of 8-5/8" .500 wall OD Fusion Bond Epoxy Coating
Reeled Pipeline Project |
| BP Troika |
316,120 ft. of 10" and 24" OD Fusion Bond Epoxy coating and
Sigma Armorcote |
| British Borneo Allegheny |
152,000 ft of 12", 16" and 20" OD Fusion Bond Epoxy Coating |
| British Borneo Morpeth |
198,000 ft. of 8" and 12" OD Fusion Bond Epoxy, Triple Joint
Welding, Buckle Arrestor Insertion, Anode Installation. |
| ChevronTexaco Gemini |
293,000 ft. of 12" OD Fusion Bond Epoxy Coating, Buckle Arrestor
Insertion, Anode and Anode Taper Installation |
| ChevronTexaco Genesis |
161,500 ft. of 14" OD Fusion Bond Epoxy Coating, 49 Integral
Ring Buckle Arrestor Insertions, 71 Sleeve Buckle Arrestor Insertions |
| ChevronTexaco Malongo PL |
67,100 ft. of 24" OD Fusion Bonded Epoxy, Concrete Weight
Coating |
| ChevronTexaco Venice Gathering Expansion |
279,000 ft. of 24" OD Fusion Bonded Epoxy |
| Conoco Joliet |
65,000 ft. of 8" and 12" OD Fusion Bond Epoxy Coating |
| Delos Marco Polo |
|
| Dow Pipeline Project |
150,000 ft. of 8" and 26" OD Fusion Bond Epoxy, Multiple
Joint Fabrication, Concrete Weight Coating |
| Duke Energy Dauphine Island |
14,000 ft. of 8" and 200,880 ft. of 12" OD Fusion Bond Epoxy
Coating |
| Duke Energy |
118,000 ft. of 24" and 144,720 ft. of 30" OD Fusion Bond
Epoxy and Concrete Weight Coating |
| Duke Maritimes & N.E. |
|
| El Paso Cameron Highway |
140 Miles of 24" and 240 Miles of 30" OD Fusion Bond Epoxy
and Concrete Weight Coating |
| Enron Columbia |
OD Fusion Bonded Epoxy First major international project
where Bayou Coating, LLC was involved in transporting coated
pipe to a foreign destination.This required special handling.
|
| Enron Florida Gas |
221,000 ft. of 30" and 36" OD Fusion Bonded Epoxy and Multiple
Joint Fabrication |
| Enron Florida Gas Ph IV |
146,600 ft. of 36" OD Fusion Bonded Epoxy and Multiple Joint
Fabrication |
| Enron Florida Gas Ph V |
221,000 ft. of 30" & 36" OD Fusion Bonded Epoxy and Multiple
Joint Fabrication |
| Enron Northern Border |
178,000 ft. of 30" OD Fusion Bonded Epoxy, ID Flowliner and
Blast and Multiple Joint Fabrication |
| Enserch Cooper |
640,000 ft. of 12" OD Fusion Bond Epoxy Coating First time
non slip or rough coat was applied to provide a rough surface for the tensioners
to grip. |
| Enterprise Lou-Tex |
500,000 ft. of 12" OD Fusion Bond Epoxy Coating |
| Enterprise Products |
211,000 ft. of 12" OD Fusion Bonded Epoxy and Concrete Weight
Coating |
| Exxon / Southern Nat.Gas Alabaster |
375,000' of 20" pipe OD Fusion Bonded Epoxy |
| Exxon Diana |
1,694,000 ft. of 6", 10", 18" and 20" OD Fusion Bond Epoxy
Coating, ID Flowliner & Blast, Quad Joint Fabrication (1100 - 6" & 10"),
Buckle Arrestor Insertion, Anode & Anode Taper Installation and SCR Fabrication
First simultaneous co-development of multiple deepwater fields. In water
nearly a mile deep! This project was flawlessly executed with a seven times
better than industry average safety record, more than $100 million under
budget, and ahead of schedule.The Hoover-Diana is the world's deepest surface-piercing
oil and gas production platform with associated subsea tieback system.The
project had a record pipelay at a speed of over 4 miles per day. |
| Exxon Heritage |
38,500 ft. of 12" OD Fusion Bond Epoxy Coating, Double Joint
Fabrication |
| Exxon Marshall/Madison |
150,000 ft. of 6" and 10" OD Fusion Bond Epoxy Coating, ID
Flowliner & Blast, Buckle Arrestor Insertion, Anode and Anode Taper Installation
and TSA coating |
| Exxon Mica |
450,000 ft. of 8" and 12" OD Fusion Bond Epoxy Coating, ID
Flowliner & Blast, Buckle Arrestor Insertion, Anode & Anode Taper Installation
and TSA Coating |
| Exxon Yellow Hammer |
1,000,000 ft. of 6",8" and 10" OD Fusion Bond Epoxy Coating
and Anode & Anode Taper Installation |
| Fluor Daniels Engr Mariquito |
163,000 ft. of 20" X65 Fusion Bond Epoxy Coating |
| Front Runner - Poseidon |
|
| Gulf Terra Phoenix |
|
| Lakehead Pipeline |
1,473,160 ft. of 20" X65 Fusion Bond Epoxy Coating |
| Leviathon Manta Ray |
235,000 ft. of 14" OD Fusion Bond Epoxy Coating, Buckle Arrestor
Insertion and Anode Installation |
| Marathon Arnold |
88,000 ft. of 4" and 8" OD Fusion Bond Epoxy Reeled Pipeline
Project |
| Marathon Ewing Bank #873 |
50,000 ft. of 8" OD Fusion Bond Epoxy |
| Marathon Oyster |
100,000 ft of 6" and 10" Pipe-in-Pipe, Reeled Pipeline Project,
OD Fusion Bond Epoxy Coating |
| Marathon Ship-Shoal |
50,000' of 8-5/8" Reeled Pipeline Project OD Fusion Bond
Epoxy Coating |
| Ocean Energy Zia |
16 mile flowline of 5.563" .480w carrier pipe inside 10.75"
x .438w casing pipe. OD Fusion Bond Epoxy, Multiple Joint Fabrication, Pipe-in-Pipe
Insertion, Spray Applied PUF and Jacket. Reeled Pipeline Project. |
| Shell Amberjack |
531,900 ft of 20" and 24" OD Fusion Bond Epoxy Coating |
| Shell Auger |
951,100 ft. of 12", 14", 16" and 20" OD Fusion Bond Epoxy
Coating, ID Flowliner & Blast, Quad Joint Fabrication, Buckle
Arrestor Insertion, Anode and Anode Taper Installation Worlds
1st application of J-lay pipelay technology.Set Gulf of Mexico
pipelay water depth record at time of construction. |
| Shell Auger III |
111,700' of 12" FusionBond Epoxy Coating. |
| Shell Barracuda |
370,000 ft. of 20" OD Fusion Bond Epoxy Coating, Buckle Arrestor
Insertion, Anode and Anode Taper Installation |
| Shell Brutus |
264,000 ft. of 20" OD Fusion Bond Epoxy Coating, ID Flowliner
& Blast, 197 Welded Buckle Arrestors with Anodes, 140 Sleeve Type Buckle
Arrestors and Concrete Weight Coating |
| Shell Bud |
80,000 ft. of 4" OD Fusion Bond Epoxy Coating and ID Flowliner
& Blast |
| Shell Bullwinkle to Boxer |
45,000' of 16" OD Fusion Bond Epoxy Coating, Buckle Arrestor
Insertion Completed in 1997 for Green Canyon 64, 65 and 109 at 1,353' water
depth Worlds tallest fixed platform in 1998 |
| Shell Cinnamon |
78,000 ft. of 6" and 8" OD Fusion Bond Epoxy Coating Deepest
Tripod Jacket in the World at Installation |
| Shell Cobia |
239,000 ft. of 20" x .500 wall OD Fusion Bond Epoxy Coating,
Buckle Arrestor Insertion, Anode and Anode Taper Installation |
| Shell Cognac |
131,600' of 12" OD Fusion Bond Epoxy Coating |
| Shell Concha / Lou-Tex |
1,400,000 ft. of 10" OD Fusion Bond Epoxy Coating |
| Shell Crosby |
186,000' of 8" and 12" OD Fusion Bond Epoxy Coating, ID Flowliner
& Blast, Quadruple Joint Fabrication, Buckle Arrestor Insertion, Anode &
Anode Taper Installation, Polyurethane Foam Insulation and Jacket,Transition
Joint Insulation, Insulation Half Shells for Offshore Field Joints, Pipe-in-Pipe
Insertion |
| Shell Enchilada |
236,000 ft. of 30" x .688w OD Fusion Bond Epoxy Coating,
Buckle Arrestor Insertion, Anode & Anode Taper Installation, Concrete Weight
Coating |
| Shell Europa |
356,000 ft. of 8" and 12" OD Fusion Bond Epoxy Coating, ID
Flowliner & Blast, PIP, Bulkhead and SCR Quad Joint Fabrication, Buckle
Arrestor Insertion, Anode & Anode Taper Installation, Polyurethane Foam
Insulation and Jacket, Pipe-in-Pipe Insertion and SCR Fabrication. |
| Shell Gunnison |
|
| Shell Habanero |
Double 12 Mile Flowlines of 6.625" x .719 wall carrier pipe
inside 10.75" .438 wall casing pipe OD Fusion Bond Epoxy Coating,
Quadruple Joint Fabrication, Pipe-in-Pipe Insertion, Spray Applied
PUF and PE Jacket |
| Shell Hickory |
116,160 ft. of 20" OD Fusion Bond Epoxy Coating, Anode Installation
and Concrete Weight Coating |
| Shell King |
33,000 ft. of 5" OD Fusion Bond Epoxy Coating, Quad Joint
Fabrication and application of C-THERM Cast-on-Pipe Epoxy Syntactic Foam
Insulation.for Dual 3 Mile Flow Lines. First Major Subsea Piping System
to be Insulated by the C-Therm Cast-on-Pipe Process |
| Shell Llano |
12" & 8" Pipe-in-Pipe Subsea Flowlines connecting to Auger |
| Shell Macaroni |
136,000 ft. of 6" and 136,000 ft. of 10" OD Fusion Bond Epoxy
Coating, ID Flowliner & Blast, Multiple Joint Fabrication, Buckle Arrestor
Insertion, Anode and Anode Taper Installation, Polyurethane Foam Insulation
& Jacket, Pipe-in-Pipe Insertion and Insulation Half Shells for Offshore
Field Joints. First Deepwater J-Lay Pipe-in-Pipe in the Gulf of Mexico |
| Shell Manatee |
Twin 10 mile flowlines of 6.6256" x .625 wall carrier pipe
inside 10.75" x .625 wall casing pipe. OD Fusion Bond Epoxy Coating, Multiple
Joint Fabrication, Pipe-in-Pipe Insertion, Polyurethane Foam Insulation
and Jacket |
| Shell Mensa |
429,000 ft. of 6" and 12" OD Fusion Bond Epoxy Coating, ID
Flowliner & Blast, Quad Joint Fabrication, Buckle Arrestor Insertion, and
Anode & Anode Taper Installation for Reeled Pipeline Project Deepest subsea
completion to date on the Gulf of Mexico (July 1998) |
| Shell Mars |
OD Fusion Bond Epoxy Coating, Fabrication of844 - 14" Quadruple
Joints and 833 - 18" Quadruple Joints, Buckle Arrestor Insertion, Anode
Installation. Set deepwater installation record at time of installation.
|
| Shell Mississippi Canyon Gas Gathering System |
236,000' of 30" x .562 wall OD Fusion Bond Epoxy Coating,
Buckle Arrestor Insertion, and Anode Installation |
| Shell Odyssey |
260,850 ft. of 16" OD Fusion Bond Epoxy Coating |
| Shell Popeye |
250,500 ft. of 6" OD Fusion Bond Epoxy Coating and ID Flowliner
& Blast for Reeled Pipeline Project |
| Shell Ram Powell |
231,000 ft. of 12" and 14" OD Fusion Bond Epoxy Coating and
ID Flowliner & Blast, Quad Joint Fabrication, Buckle Arrestor Insertion,
Anode and Anode Taper Installation This project surpassed the depth of Mars!
|
| Shell Rocky |
96,000 ft. of 3" and 6" OD Fusion Bond Epoxy Coating and
ID Flowliner & Blast Pipe-in-Pipe for Reeled Pipeline Project |
| Shell Salsa |
12" and 14" pipe OD Fusion bond Epoxy Coating |
| Shell Serrano and Oregano |
165,000 ft. of 6" casing pipe and 10.75" carrier pipe OD
Fusion Bond Epoxy Coating, ID Flowliner and Blast, Multiple Joint Fabrication,
Buckle Arrestor Insertion, Anode and Anode Taper Installation, Polyurethane
Foam Insulation and Jacket, Pipe-in-Pipe Insertion and SCR Fabrication.
|
| Shell Tahoe II |
375,340 ft. of 4", 6" and 8" OD Fusion Bond Epoxy Coating
and ID Flowliner & Blast Reeled Pipeline Project |
| Shell Ursa |
491,000 ft. of 18" and 20" OD Fusion Bond Epoxy Coating,
ID Flowliner & Blast, Quad Joint Fabrication, Buckle Arrestor Insertion,
Anode & Anode Taper Installation and SCR Quad Fabrication |
| Spinnaker |
44,000 ft of 12" OD Fusion Bond Epoxy and 1.50" of 165#
Concrete Weight Coating |
| Tennessee Gas Pipeline Viasca Knoll Gas Gathering |
132,000 ft. of 20" OD Fusion Bond Epoxy Coating |
| Texaco British Gas Trinidad |
216,500' of 24" OD Fusion Bond Epoxy Coating |
| Texaco Discovery |
828,000 ft. of 18", 20", 24" and 30" OD Fusion Bond Epoxy
Coating Deepest 30" pipeline and riser in Gulf of Mexico at time of installation!
|
| Texaco Petronius |
260,950 ft. of 16" OD Fusion Bond Epoxy Coating |
| Total Fina Elf Canyon Express |
616,520 ft of 12" and 17,800 ft of 6" OD Fusion Bond Epoxy
Coating, Buckle Arrestor Insertion and Multiple Joint Fabrication |
| TotalFinaElf and Chevron Matterhorn |
|
| TransCanada Express Pipeline |
1,599,416 (302 miles) of 24" OD Fusion Bond Epoxy Coating
|
| TransCanada Merida Project |
875,440 ft. of 22" and 656,000 ft. of 24" OD Fusion Bond
Epoxy |
| TransCanada Tuscarora Pipeline |
21,25,000 ft. of 20" OD Fusion Bond Epoxy Coating |
| TransColorado Pipeline |
1,379,160 ft. of 22" and 90,744 ft. of 24" OD Fusion Bond
Epoxy Coating |
| Williams Field Services |
6,800 ft. of 20" and 2,500 ft. of 18" and 132,000 ft of 12"
OD Fusion Bond Epoxy Coating and Concrete Weight Coating |
| Williams Mountaineer |
267,000 ft of 20" OD Fusion Bond Epoxy Coating and Concrete
Weight Coating |